From:                              route@monster.com

Sent:                               Thursday, April 07, 2016 11:53 AM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: p6 Scheduler

 

This resume has been forwarded to you at the request of Monster User xapeix03

James (Tim) Anders 

Last updated:  04/22/15

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Houston, TX  77065
US

Home: 1-8649070707   
timanders155@yahoo.com
Contact Preference:  Telephone

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: James (Tim) Anders

Resume Value: xuvdegvssttirfbw   

  

 

 

 

 

James H. “Tim” Anders –TWIC Holder

Adapt, Overcome, Improvise

864-907-0707 cell

Master Scheduler – Planner, Scheduler & Manager, Interface Installation and SURF Coordinator

Timanders155@yahoo.com

SUMMARY

Tim Anders is a Master Planner /  Scheduler - SME with 30 years ‘of hands-on’ experience in the installation of pipeline refinery expansions, SURF, midstream & upstream oil and gas industry scheduling , managing projects and project controls for a variety of SURF installations and surface projects,  including fabrication. Tim not only has been the look – ahead installation Interface Planner for the many different spreads of SURF and pipelines; he has also been the project manager’s eyes and ears for resource of installation shortages. Tim takes the next step with the fabrications shops to find out a ROS date directly from each resource shortage or vendor (i.e. Spools, Steel, Blow-Off Preventer, and Trees)). Tim is also an expert in Pipeline & Offshore Installations as well as API standards, Interface project coordination; SURF Installation, forecasting, and scheduling and has spent 27 years in Planning Management. Tim has unique hands on knowledge of facilities to complement his fabrication, engineering and management skills. Tim has worked International Expat and Domestic- W. Africa in Nigeria, Lagos, and Snake Island also in Equatorial Guinea & Gulf of Mexico.

 

Qualifications include: Over 25 years as Master Planner / Scheduler, Project Interface

 

·                     Team leader on over 30 projects having man-hours in excess of 100,000

Pre Feed, Feed, Level 1, Level 2 – planning, execution, Installation of  fit, weld of installation, commissioning

·                     Supervisory experience with six sigma quality

·                     Expert knowledge of:

1.      SAP, Microsoft Planner, and other Microsoft p[products i.e. excel and word Maximo, JD Edwards, API Standards and Primavera (P6) v 7.2

2.      SURF Installation of Wet Completions , Topside Completion

3.      Construction Interface of steel, piping, electrical, safety, performance and Client Turnover Completions

4.      Performance measures and their applications

5.      Project schedule monitoring and control

6.      Subsea components and systems

7.      Pipeline & Facilities Fabrication Pump Stations & 3 Valve Clusters

·                     Strong interpersonal / articulating skills

·                     Excellent written and oral communication skills

·                     Strong leadership and interpersonal skills with ability to work as a team member

·                     Experienced in multinational environments

·                     Extensive experience overseeing vendors, suppliers, contractors and consultants.

 

Specialties:

Installation of Facilities, Pipelines, Midstream, SURF Offshore Platforms, FPSO, FSO,  FPU,TLP, Floaters, Umbilical’s, Subsea, Spar, Hull, Primavera P6, Mooring, Topsides, Drilling, Upstream and HPHT Well Completions with API specifications.

 

PROFESSIONAL EXPERIENCE

 

12/2012 –10/2013 TransCanada (PTAG)

Gulf Coast PMT-2 /Keystone

Interface Planner/Scheduler – (Owners side)

Tim report directly to the Project Manager – PMT-2, Gulf Coast for Interface between 8 different facilities in various locations among the PMT-2 spread of the Main Line.  Articulating with the sites, site leads materials shortages and fabrication shops for the successful Mechanical Completion on time facility delivery of construction. Interface coordinating planner for such shortages; Spools, Steel. Pipe Supports, Electrical, Equipment and Labor. Planned look a head’s for a successful on time completion, Primavera 6 v 7.2. CPM

 

11/2012 -12/2012 Hess Corporation

Stampede Project – TLP

Planner / Scheduler

Developed the owners schedule (Hess) FEED and Execution for Stampede, Owner was not going to fund project in 2013 due to partners (5). Primavera P6 v 7.1

 

5/2012 – 12/2012 Chevron Exploration (Velosi)

Big Foot Platform - TLP

Interface Coordinator / Planner/Scheduler

Top side interface coordinator between owner (Chevron) and the Fabricator (GMF).  I was assigned to the Process Module - Main Deck, Mezzanine Deck and the Production Deck. Daily fabrication updates reported from interface to the construction staff of Chevron and GMF of the fabrication of primary steel, secondary steel, piping, oil production equipment and E & I.

 

 

 

1/2012 – 5/2012 Exxon Mobil Development (Orion Engineering)

Julia -  Sub-Sea Project

Primavera P6.0 v 7 Scheduler

EPC 1-4 Scheduler for the Julia re-start, tie in to Chevron’s JSM Project. HPLT. Subsea and topside development. Installation of Subsea, Umbilical’s, Risers, Flow – Lines and Flying Leads

 

 

 

2010 – 2011 - McMoRan Oil & Gas (Collarini)

Davy Jones 1

Master Scheduler P6 V 7 & Manager – Fabrication Offshore (Hostile Environment Well Head) HPHT Team

Project Controls Manager for the Installation of jacket, topsides (including all processing equipment) well production tie back, well production liner and production tubing.  Developed budgets, schedules, and forecast risk analysis modeling for the project.

2009 – 2010 - Savannah River – DOE / National Nuclear Security Administration (NNSA) (Navarro Engineering)

Project Controls &Master  Scheduler P6 V7

Manager of controls team overseeing the fabrication of the process plant area for the Department of Energy (DOE).

 

2008 -2009 - Middle Eastern Consortium - Ras Laffan Liquefied Natural Gas Co. Ltd

Project Control Manager & Master  Scheduler P6 – Offshore Fabrication

Project Controls Manager for the $2.3 billion modification of the hydrocarbon process and platform facilities.  Project included jacket modifications, expansion of the dehydration and sweeting facilities and installation of a new LNG plant all attendant infrastructures, such as LNG storage tanks, loading jetties and three liquefaction process trains.

2008 – 2008 – Kosmos Energy, LLC

Jubilee Deepwater Development

Project Control Master Scheduler & PCM P6 V 6.2

Project Controls Manager for the Jubilee Deep-water Development (Ghana, Africa) including fabrication of the FPSO, Installation of topsides and tie-in of subsea wells.   Focus on SURF, deliverables, cost controls and schedule. Acted as the internal project control resource to implement consistent project management and material fabrication coordination processes for Project Managers, contracts personnel, and other senior systems and accounting personnel.

 

 

1989 – 2008 – Ameri-Pro International – Upstream Capital Projects

Project Control Manager & Master Scheduler (SME)

BP Thunder Horse Fabrication / Installation of PLET and PLEM and Sub-Sea Phase I & 2 upstream.

(2006 to 2008)  Provided status, control and progress reporting services on project (EV). Collected the essential information necessary to generate reports and progress of work to interface the schedule with the project budget. Analyze accuracy of schedules submitted by outside parties contributing to the Thunder Horse.

 

Chevron Nigeria West Africa Gas Pipeline (WAGP)

(2003 to 2006) -Fabrication offshore and onshore for the 678 kilometers (421 mi) long pipeline from the gas reserves in Nigeria's Escravos region of Niger Delta area to Benin, Togo and Ghana. It is the first regional natural gas transmission system in sub-Saharan Africa.  Project Controls Manager of Schedulers Quality Surveyors, Cost Controls, Contracts Assistant and Sub Contractor Administrator.

 

Triton Energy/Hess Ceiba Project Topsides and Jacket Installation

(2002 to 2003)

Moni Pulo Ltd Abana Gulf of Guinea Project (2000 to 2003) Topsides and jacket installation

Bredasdorp Alliance South Africa Mossel Bay, Bredasdorp Basin Gas Project (1998 to 2000) Well tie-back and pipeline

 

Ekpe Gas Compression Platform

(1997 to 1997) Topside decks including detailed engineering, procurement, fabrication, hook-up and pre-commissioning assistance for a new compression platform.

 

 

Zafiro Gas Project, Gulf

, (1995 to 1996) Sub-sea facilities consisting of eight sub-sea trees arranged on 2-well flow-line loops, 24 miles of 6 inch flow-lines, 12 miles of control umbilical, 8 flexible risers and 4 dynamic umbilical risers. For design simplicity and flexibility, field proven equipment and methods were employed wherever possible, leading to the use of a "standard" 4 by 2 subsea tree design, a direct hydraulic control system and chokes located aboard the FPSO.

 

Nigerian National Petroleum Corporation FPSO (1993 to 1995) Installation of flowlines and risers to FPSO.

 

Amerada Hess Bioko Island, Mobil Nigeria, Shell Amberjack and Manta Ray Expansions (1989 to 1993)  Duties included developing work packages, specifying equipment deliverable of selected vendors for contracts, and expediting equipment.  The Bioko Island project included detailed engineering and schedule of eight flexible risers connecting sub-sea flow lines to the 2 TLPs in water depths of 920 feet and 1,640 feet, respectively, and a 12-inch oil export flexible riser connecting to an FPSO in 320 feet water depth. Scope included tube and hang-off design review, static, clashing and extreme events dynamic analysis to establish riser configurations, bend curve stability and routing, interface loads and bend stiffener requirements, and finalization of the flexible riser specification. Work scope also included procurement package engineering and installation support.

 

1983 – 1989 – Marlin Offshore International LTD

Planning/Scheduling Engineer

Responsible for Drilling Rig Refurbishments, planning, scheduling, and maintaining all schedules dealing with engineering, procurement, steel replacement, mechanical upgrades and commissioning on the Self Erecting Tender Assisted drilling unit, WD Kent, Searex IX, The Charley Graves Refurbishment /Upgrade Projects.

 

1977 – 1983 - Good Hope Refinery

Fabrication Planner, FCCU expansion and New vies-breaker build

Daily and look ahead planning of refinery greenfield and brownfield at location.

EDUCATION & HONORS

MSc Logistics Engineering – 2004 University of Liverpool – Proctor Internet studies self-paced

(40 hours)

Bachelor Science Logistics Management – 2004 University of Liverpool undergraduate studies

(145 hours)

Military – 1973-1992, Decorated Marine – Honorable Discharge CWO-W5

USMC - MOS 8541 & 2340

 

 

 



Experience

BACK TO TOP

 

Job Title

Company

Experience

planner interface

TransCanada PipeLines Limited

- Present

 

Additional Info

BACK TO TOP

 

Current Career Level:

Experienced (Non-Manager)

Years of relevant work experience:

More than 15 Years

Date of Availability:

Immediately

Work Status:

US - I am authorized to work in this country for any employer.

Active Security Clearance:

Active Top Secret/SCI

US Military Service:

Yes

Citizenship:

US citizen

 

 

Target Job:

Target Job Title:

planner scheduler

 

Target Company:

Company Size:

Occupation:

Engineering

·         General/Other: Engineering

Manufacturing/Production/Operations

·         Production/Operations Planning

Building Construction/Skilled Trades

·         General/Other: Construction/Skilled Trades

Installation/Maintenance/Repair

·         Oil Rig & Pipeline Install/Maintain/Repair

Project/Program Management

·         Project Management

 

Target Locations:

Selected Locations:

US-TX-Houston

Relocate:

Yes

Willingness to travel:

Up to 50% travel

 

Languages:

Languages

Proficiency Level

English

Fluent